Description
MOTS-c — lyophilized vial
MOTS-c is a mitochondrial-derived signaling peptide supplied as a
sterile-filtered, lyophilized (freeze-dried) white powder in a sealed
glass vial. Supplied in a range of vial strengths — select an available option below.
Specifications
- Peptide: MOTS-c
- Form: Lyophilized powder
- Purity: > 99% (HPLC)
- Presentation: Sterile-sealed glass vial
Storage
Store lyophilized vials at −20 °C in a dry, dark
environment. After reconstitution, store at 2–8 °C and use
within 30 days.
Research Use Disclaimer
This product is sold for laboratory research use only.
It is not a drug, food, cosmetic, or supplement, and it is not intended for
diagnostic, therapeutic, or in-vivo use in humans or animals. By purchasing
this product, the buyer represents that they are a qualified researcher and
will use the product in accordance with all applicable laws and regulations.







Reviews
There are no reviews yet.